Select view block
ORD Data
Affiner les résultats
Nom de l'autorité
Organisme de certification
Code D'état
Date de publication

De

à

Affichage 331 - 336 de 408
Interim certification requirements for prefabricated septic tanks, sewage holding tanks, and effluen...
This technical information letter (TIL) has been prepared to provide interim certification requirements for prefabricated septic tanks, sewage holding tanks, and effluent chambers manufactured using alternative thermoplastics that are currently not included in CSA B66-10 Standard.
Statut :
Retiré
Date de publication :
Organisme de certification :
CSA Group Testing & Certification Inc.
Interim Certification Requirements for LED Retrofit Kits and Field Retrofitted Luminaires
TIL CSA B-79A replaces TIL CSA B-79 which was published in April, 2010, to deal with the safety of retrofitted luminaires, including products employing light-emitting-diode (LED) lamp technologies, with or without a driver or power supply, or intended for direct connection to the mains or to a lamp holder. At the time of publication of TIL CSA B-79, CSA standards for LED lighting equipment and…
Statut :
Retiré
Date de publication :
Organisme de certification :
CSA Group Testing & Certification Inc.
Interim Certification Requirements for folded/formed poly (vinyl chloride) (PVC) pipe for existing s...
This Technical Information Letter (or TIL) contains construction, marking and test requirements for folded/formed poly (vinyl chloride) (PVC) pipe for existing sewer rehabilitation, and shall be used in conjunction with ASTM Standard F1871.
Statut :
Retiré
Date de publication :
Organisme de certification :
CSA Group Testing & Certification Inc.
Acceptance Procedure for Welds on Enclosures
Enclosures of Welded Construction for Class I, Division 1, Hazardous Locations
Statut :
Retiré
Date de publication :
Organisme de certification :
CSA Group Testing & Certification Inc.
Interim Certification Requirements for Purged and Pressurized Electrical Equipment for Use in Class ...
Statut :
Retiré
Date de publication :
Organisme de certification :
CSA Group Testing & Certification Inc.
Arc Sustaining Test REquirements for Plugs and Receptacles for Use in Hazardous Locations
This T.I.L. is intended to clarify the arc sustaining test described in Clause 11.2.2 of Standard C22.2 No. 159-1982.
Statut :
Retiré
Date de publication :
Organisme de certification :
CSA Group Testing & Certification Inc.

Spacer