ISO 18828-2:2016

Industrial automation systems and integration — Standardized procedures for production systems engineering — Part 2: Reference process for seamless production planning
ISO 18828-2:2016 describes a reference planning process for seamless production planning. The scope of the discussed reference process focusses on the planning of production systems such as make-to-stock or assemble-to-order production. The analysis of the process activities has been limited to those within the production planning. The following aspects are within the scope of ISO 18828-2:2016: · general overview of the reference planning process; · basic principles of the process model; · description of each level identified within the reference planning process for production planning; · structure of activities and relations within each planning discipline; · dependencies of interdisciplinary activities. The following items are outside the scope of ISO 18828-2:2016: · material requirement planning/manufacturing resource planning; · production order control; · production process; · early stage product design; · order management, inventory management, purchasing, transportation, warehousing; · production facilities planning/manufacturing facilities planning (physical plant and equipment), including any kind of resource that is not directly related to the manufacturing process; · value chain (inbound logistics, operations management, outbound logistics, marketing and sales); · resource visualization; · process simulation.
OEN:
ISO
Langue:
English
Code(s) de l'ICS:
25.040.40
Statut:
Publié
Date de Publication:
2016-10-18
Numéro Standard:
ISO 18828-2:2016