Standard Method of Test for Flame Resistance - Methenamine Tablet Test for
Textile Floor Coverings
ULC Standards has withdrawn this Standard effective July 24, 2014 due to the lack of use and reference in the Canadian Industry and Regulations.
1. PURPOSE AND SCOPE
1.1 This method determines the flammability of finished textile floor covering
materials when exposed to an ignition source (methenamine tablet) under
specified conditions.
1.2 This method is applicable to all types of…
Electricité - Symboles graphiques pour plans d'architecte
1. Domaine d'application
1.1 Cette norme renferme des symboles à l'intention des personnes qui
préparent ou utilisent des schémas de câblage électrique et des schémas
d'ensemble en architecture et en construction. Ces symboles ont été
réalisés aussi simplement que possible et ne visent nullement à décrire
la structure des dispositifs…
Water quality — Determination of free chlorine and total chlorine — Part 2: Colorimetric method usin...
Specifies a procedure for water, readily applicable to field testing; it is based on measurement of the colour intensity by visual comparison of the colour with a scale of standards which is regularly calibrated. Sea water and waters containing bromides and iodides comprise a group for which special procedures are required. The procedure is applicable to concentrations, in terms of chlorine, from…
Procedure for Measurement of Sound and Vibration Due to Blasting Operations
1. Scope
1.1 This Standard covers the procedures for the measurement of airborne sound (Clause 4) and ground-borne vibration (Clause 5) from blasting such as construction and quarrying. Note: This Standard should not be used for measurements of blasts underground without a full evaluation of the frequency content of the vibration, to be sure it falls within the limits of this Standard as…
1. Scope
1.1 General
1.1.1 This Standard specifies minimum requirements for a suppli er's quality assurance program - Category 1. The supplier is responsible for planning and developing a program which assures that each management, design, and technical responsibility for quality is integrated and executed effectively. The program is aimed primarily at being preventive by…
1. Scope
1.1 General
1.1.1 This Standard specifies minimum requirements for a s upplier's quality assurance program - Category 2. The supplier is responsible for planning and developing a program aimed primarily at controlling production processes as well as inspection and test verifications and corrective action which (a) assure that products or services conform to specified…
1. Scope
1.1 General
1.1.1 This Standard specifies minimum requirements for a supplier's Quality Assurance Program - Category 3. The supplier is responsible for planning and developing a program aimed primarily at controlling inspection and test verifications which (a) assure that products or services conform to specified requirements; and (b) readily detect and control the…
1. Scope
1.1 General
1.1.1 This Standard specifies minimum requirements for a supplier's quality assurance program - Category 4. The supplier is responsible for planning and developing a program which provides objective evidence that contract requirements are met and which detects and dispositions nonconforming products or services.
1.1.2 This Standard may be applied to…
Asphalt Shingle Application on Roof Slopes 1:6 to Less Than 1:3
1. Scope
1.1
This Standard describes the minimum application requirements for asphalt strip shingles or low slope shingles on roofs with slopes from 1:6 to less than 1:3.
Note: Roof Substrate and Ventilation Below Substrate. Appendix A is included to provide recommendations for acceptable substrate for shingles; Appendix B, recommendations for acceptable ventilation below the shingle…
Asphalt Shingle Application on Roof Slopes 1:3 and Steeper
1. Scope
1.1
This Standard describes the minimum application requirements for asphalt strip shingles on roofs with slopes 1:3 and steeper.
Note: Roof Substrate and Ventilation Below Substrate. Appendix A is included to provide recommendations for acceptable substrate for shingles; Appendix B, recommendations for a cceptable ventilation below the shingle substrate; and Appendix C,…