Industrial-process control valves. Part 6: Mounting details for attachment of positioners to control...
Permits a variety of positioning devices which respond to a linear motion to be mounted on the actuator of a control valve, either directly or by employing an intermediate mounting bracket.
The standardized mounting applies to positioners which are mounted on the side of the actuator, to those actuators which have a travel of 100 mm or less, and is designed to cover three basic types of actuator…
Electrical installations of buildings. Part 7: Requirements for special installations or locations. ...
Applies to the connection of data processing equipment to the electrical power installation of buildings, where the data processing equipment:
- has earth leakage current exceeding the limit specified in IEC 60950 and complies with IEC 60083;
- complies with the requirements of IEC 60950 which cover leakage current.
May also be applied where installations, other than data processing, such as…
Effective Sterilization in Hospitals by the Steam Process
Defines essential elements in a program for using steam to
sterilize products in hospitals and similar non-industrial
facilities with the object of achieving an adequate level of
sterility assurance and minimizing the risk of injury to patients
and to health and safety of hospital staff that is attendant on
the use of the steam process.
Safety in electroheat installations. Part 1: General requirements
Includes the general safety requirements for the protection of persons against dangers of electrical origin in industrial electroheat installations: arc furnaces, induction furnaces, appliances for indirect resistance heating, etc.
Electromagnetic compatibility for industrial-process measurement and control equipment. Part 1: Gene...
Applies to electromagnetic compatibility of industrial-process measurement and control. Deals with general considerations in the context of the complexity of electromagnetic compatibility and the problems with which manufacturers and users of industrial-process measurement and control equipment may be confronted. Makes manufacturers and users of industrial-process measurement and control…
Covers the construction and performance of gravity and forced air
central furnaces for use with natural gas and propane with inputs
up to and including 400,000 Btu/h (117.23 kW) gas and propane for
installation in residential, commercial and industrial
occupancies and in mobile housing and recreational vehicles.
Construction and Test of Electric Cranes and Hoists
1. Scope
1.1 This Standard applies to all types of electric cranes, hoists, and monorails for voltages of 750 V and less between conductors, designed to be installed and used in accordance with the Rules of the Canadian Electrical Code, Part I.
1.2 This Standard includes the design of the collector arrangements for the contact conductors along the main runway.
Note: The…