Rechercher

Affiner les résultats
Taper
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Date de publication

Di

à

Affichage de 4237 - 4248 de 12908
Avis d'intention

Entreposage, manutention et distribution des ...

1.1 This Standard specifies the minimum design, construction, operation, maintenance, and emergency response requirements for the storage, handling, and dispensing of aviation fuels at aerodromes. 1.2 This Standard specifies...
Avis d'intention

Alarme incendie et câble de signalisation

1.1 This Standard applies to single- and multiple-conductor fire alarm and signal cables with a maximum nominal voltage rating of 300 V and a minimum temperature rating of 60 ° C for use in buildings and other structures in...
Avis d'intention

Splitters

1.1 This Standard applies to splitters, having a current rating of 5000 A and less, intended for installation in nonhazardous locations in accordance with the Rules of the Canadian Electrical Code, Part I on systems having...
Avis d'intention

Ventilateurs et ventilateurs

1.1 This Standard applies to fans and ventilation equipment that is a) cord-connected, rated at not more than 250 V; b) permanently-connected to supply circuits of 600 V and less, single-phase or three-phase; c) used in non...
Avis d'intention

Ferrules nues et couvertes

1.1 These requirements cover bare and covered ferrules intended for field wiring and factory wiring for use in accordance with the National Electrical Code, ANSI/NFPA-70 and Canadian Electrical Code, CSA C22.1. 1.2 These...
Avis d'intention

Antidémarreurs avec éthylomètre

1.1 General This Standard describes the performance standards, technical specifications, physical markings, and qualification tests required for breath alcohol ignition interlock devices. 1.2 Purpose This Standard identifies...
Avis d'intention

Pompes à béton et flèches de distribution

1.1 This Standard applies to the design, manufacture, installation, operation, inspection, testing, and maintenance of concrete pumps, placing booms, and delivery systems. Note: See Figures 1 to 6 for illustrations of the...

Spacer