Technologie de l’information - Installation et infrastructures de centres de traitement de données -
Porté:
This document specifies processes for the management and operation of data centres. The primary focus of this document is the operational processes necessary to deliver the expected level of resilience, availability, risk management, risk mitigation, capacity planning, security and energy efficiency.
The secondary focus is on management processes to align the actual and future demands of users.
Figure 2 shows an overview of related processes.
The transition from planning and building to operation of a data centre is considered as part of the acceptance test process in Clause 6.
NOTE 1 Only processes specific for data centres are in the scope of this document. Business people management, financial management, etc. are out of scope.
NOTE 2 Specific skill sets are required of those working in and operating a data centre.
Raison d’être du projet
Note : L’information ci-dessus a été recueillie et est diffusée par le Conseil canadien des normes (CCN) pour les besoins de son système de notification centralisé et transparent pour l’élaboration de nouvelles normes. Le système permet aux organismes d’élaboration de normes (OEN) accrédités par le CCN et aux membres du public d’être informés des nouveaux travaux d’élaboration de normes au Canada. Il donne aussi aux OEN accrédités la possibilité de repérer et de résoudre les cas de doubles emplois éventuels dans les normes et les travaux de normalisation.