Systèmes de génération d’énergie éolienne — Partie 12-1 : Mesures de performance de puissance des éoliennes de production d’électricité

Logo
CSA Group
Organisme d'élaboration de normes:
Programme de travail:
Numéro de référence:
CAN/CSA-IEC 61400-12-1:17
Catégorie de norme:
Norme nationale du Canada - Adoption d'une Norme internationale
Type d’activité d’élaboration de normes:
Confirmation
Code ICS:
27.180
Statut:
En cours d'élaboration
Date de début de la période de commentaires OEN:
Date de fin de la période de commentaires des OEN:
Affiché le:

Porté:

Champ d’application

This part of IEC 61400 specifies a procedure for measuring the power performance 
characteristics of a single wind turbine and applies to the testing of wind turbines of all types 
and sizes connected to the electrical power network. In addition, this standard describes a 
procedure to be used to determine the power performance characteristics of small wind 
turbines (as defined in IEC 61400-2) when connected to either the electric power network or a battery bank. The procedure can be used for performance evaluation of specific wind turbines at specific locations, but equally the methodology can be used to make generic comparisons between different wind turbine models or different wind turbine settings when site-specific conditions and data filtering influences are taken into  account. 

The wind turbine power performance characteristics are determined by the measured power curve and the estimated annual energy production (AEP). The measured power curve, defined as the relationship between the wind speed and the wind turbine power output, is determined by collecting simultaneous measurements of meteorological variables (including wind speed), as well as wind turbine signals (including power output) at the test site for a period that is long enough to establish a statistically significant database over a range of wind speeds and under varying wind and atmospheric conditions. The AEP is calculated by applying the measured 
power curve to reference wind speed frequency distributions, assuming 100 % availability. 

This document describes a measurement methodology that requires the measured power curve and derived energy production figures to be supplemented by an assessment of uncertainty sources and their combined effects.  

Raison d’être du projet

Raison d’être du projet
To review the Standard within the required 5 year period.

Note : L’information ci-dessus a été recueillie et est diffusée par le Conseil canadien des normes (CCN) pour les besoins de son système de notification centralisé et transparent pour l’élaboration de nouvelles normes. Le système permet aux organismes d’élaboration de normes (OEN) accrédités par le CCN et aux membres du public d’être informés des nouveaux travaux d’élaboration de normes au Canada. Il donne aussi aux OEN accrédités la possibilité de repérer et de résoudre les cas de doubles emplois éventuels dans les normes et les travaux de normalisation.