Steel structures — Structural bolting — Test method to determine loss of pretension from faying surf...
Test method to determine the loss of bolt pretension (preload) caused by creep of coatings, including consideration of the specific coating, coating thickness, and other related factors.
Railway applications — Running time calculation for timetabling — Part 2: Distance-speed diagrams an...
In order to create punctual timetables, it is necessary to accurately calculate and plan out running time between stopping or passing points, headway between trains, train scheduling, rolling stock scheduling, driver and crew scheduling, operation scheduling in stations and depots and line / infrastructure capacity.
Among these values, shortest running time between stopping or passing points must…
Jewellery and precious metals — Determination of silver — ICP-OES method using an internal standard ...
This document specifies an analytical method for the determination of silver on a material considered homogeneous. The silver content of the samples lies preferably between 50 ‰ (parts per thousand) and 990 ‰ (parts per thousand). Fineness above 999,0 ‰ can be determined using a spectroscopy method by difference (e.g. ISO 15096).
NOTE Lower contents of silver can be analyzed with this method.
Doors, windows and curtain walling — Hardware for doors and windows — Vocabulary
This ISO standard specifies the terminology for hardware used in windows and pedestrian doors.
Hardware in this document refers to building hardware.
This document mainly only refers to the terminology of hardware used for the connection between window sash/casement, door leaf, and their corresponding frames as well as the hardware used for operating the window sash/casement and door leaf.…
Buildings and constructed assets — Service life planning — Part 2: Process considerations
This International Standard identifies and establishes process considerations for service life planning and a systematic framework for undertaking service life planning of a planned building or construction work throughout its life cycle (or remaining life cycle for existing buildings or construction works). The life cycle incorporates initiation, project definition, design, construction,…
Buildings and constructed assets — Service life planning — Part 3: Methods, data and communication
This International Standard identifies and establishes Methodologies, data and communication for service life planning and a systematic framework for undertaking service life planning of a planned building or construction work throughout its life cycle (or remaining life cycle for existing buildings or construction works). The life cycle incorporates initiation, project definition, design,…