Rechercher

Affiner les résultats
Code de la Classification internationale pour les normes (ICS)
Source
Code de l’organisme d’élaboration de normes (OEN)
Langue
Statut
Code de la Norme nationale du Canada (NNC)
Date de publication

De

à

Affichage 581 - 590 de 1389
Standard for Thermal Insulation – Bead-Applied One Component Polyurethane Air Sealant Foam, Part 1: ...
1.1 This Standard specifies the requirements and test methods for bead-applied one component polyurethane foam used as an insulating air sealant for both building and non-building applications. This Standard covers bead-applied one-component polyurethane air sealant foam whether applied on a building site or in a prefabrication (manufacturing) process. The one-component polyurethane foam is…
Éditeur :
ULC
Statut :
Annulée
Date de publication :
2011-11-30
Code(s) de l'ICS :
91.100.50; 91.120.10
Standard for Thermal Insulation – Bead-Applied One Component Polyurethane Air Sealant Foam, Part 2: ...
1.1 This Standard outlines requirements for the installation of factory pre-packaged bead-applied one component polyurethane foam used as an insulating air sealant for both building and non-building applications. The material is installed as air sealant foam in holes, cracks or gaps in buildings or in a prefabrication (manufacturing) process. 1.2 The requirements in this Standard apply for both…
Éditeur :
ULC
Statut :
Annulée
Date de publication :
2011-11-30
Code(s) de l'ICS :
91.100.50; 91.120.10
Standard for Thermal Insulation – Bead-Applied Two Component Polyurethane Air Sealant Foam, Part 1: ...
1.1 This Standard specifies the requirements and test methods for thermal insulating bead - applied two-component polyurethane foam used as an insulating air sealant for both building and non-building applications. This Standard covers bead-applied two-component polyurethane air sealant foam whether applied on a building site or in a prefabrication (manufacturing) process. This two-component…
Éditeur :
ULC
Statut :
Annulée
Date de publication :
2011-11-30
Code(s) de l'ICS :
91.100.50; 91.120.10
Standard for Thermal Insulation – Bead-Applied Two Component Polyurethane Air Sealant Foam, Part 2: ...
1.1 This Standard specifies the requirements for the installation of thermal insulating bead-applied two-component polyurethane foam used as an insulating air sealant (including a component within an air barrier system) for both building and non-building applications. The material is installed as air sealant foam in holes, cracks or gaps. 1.2 These are requirements for both the manufacturer and…
Éditeur :
ULC
Statut :
Annulée
Date de publication :
2011-11-30
Code(s) de l'ICS :
91.100.50; 91.120.10
Surface-active agents and detergents — Determination of water content — Karl Fischer methods
ISO 4317:2011 specifies two titration methods (volumetric and coulometric) using Karl Fischer reagent for the determination of the water content of surface active agents and detergents. These methods are applicable to products in the form of powders, pastes and solutions. They are applicable only if so indicated in the specific standard for each product. As alkaline compounds react with Karl…
Éditeur :
ISO
Statut :
Publié
Date de publication :
2011-11-28
Code(s) de l'ICS :
71.100.40
Space systems — Early operations — Part 1: Spacecraft initialization and commissioning
A general definition of initialization is that it begins at separation of the spacecraft (SC) from the launcher. In some cases, a more exact definition will be that initialization begins in flight, upon planned change in mode or state of the SC from the launch configuration. Commissioning is completed when the SC, including its payload, is certified for initial mission operations. Prior to…
Éditeur :
ISO
Statut :
Publié
Date de publication :
2011-11-28
Code(s) de l'ICS :
49.140
Space systems — Early operations — Part 2: Initialization plan
A general definition of initialization is that it begins at separation of the spacecraft (SC) from the launcher. In some cases, a more exact definition will be that initialization begins in flight, upon planned change in mode or state of the SC from the launch configuration. Commissioning is completed when the SC, including its payload, is certified for initial mission operations. Prior to…
Éditeur :
ISO
Statut :
Publié
Date de publication :
2011-11-28
Code(s) de l'ICS :
49.140
Space systems — Early operations — Part 3: Commissioning report
A general definition of initialization is that it begins at separation of the spacecraft (SC) from the launcher. In some cases, a more exact definition will be that initialization begins in flight, upon planned change in mode or state of the SC from the launch configuration. Commissioning is completed when the SC, including its payload, is certified for initial mission operations. Prior to…
Éditeur :
ISO
Statut :
Publié
Date de publication :
2011-11-28
Code(s) de l'ICS :
49.140
Cardiovascular implants — Endovascular devices — Part 3: Vena cava filters
ISO 25539-3:2011 specifies requirements for vena cava filters, based upon current medical knowledge. With regard to safety, it gives requirements for intended performance, design attributes, materials, design evaluation, manufacturing, sterilization, packaging and information supplied by the manufacturer. ISO 25539-3:2011 supplements ISO 14630, which specifies general requirements for the…
Éditeur :
ISO
Statut :
Annulée
Date de publication :
2011-11-24
Code(s) de l'ICS :
11.040.40
Road vehicles — Functional safety — Part 2: Management of functional safety
ISO 26262 is intended to be applied to safety-related systems that include one or more electrical and/or electronic (E/E) systems and that are installed in series production passenger cars with a maximum gross vehicle mass up to 3 500 kg. ISO 26262 does not address unique E/E systems in special purpose vehicles such as vehicles designed for drivers with disabilities. Systems and their components…
Éditeur :
ISO
Statut :
Annulée
Date de publication :
2011-11-13
Code(s) de l'ICS :
43.040.10