Information security - Key management - Part 5: Group key management
This document specifies mechanisms to establish shared symmetric keys between groups of entities. It defines:
— symmetric key-based key establishment mechanisms for multiple entities with a key distribution centre (KDC); and
— symmetric key establishment mechanisms based on a general tree-based logical key structure with both individual rekeying and batch rekeying.
It also defines key…
Automation systems and integration — Industrial data — Visualization elements of digital twins
This document analyses visualization elements that are key components of the interface between the physical asset and the avatar (digital replica of the physical asset).
Small craft — Hull construction and scantlings — Part 10: Rig loads and rig attachment in sailing cr...
This document specifies methods for the determination of:
— the design loads and design stresses on rig elements; and
— the loads and scantlings of rig attachments and mast steps/pillars;
on monohull and multihulls sailing craft.
It also gives, in Annexes, "established practices" for the assessment of mast steps/pillars or chainplates
NOTE 1 Other engineering methods can be used…
Biotechnology — Specification on data management and publication in microbial resource centers
This document specifies requirements for data management and publication in microbial resource centres (MRCs) to enable consistent formatting, and a quality control workflow to improve the overall quality of data. It also provides recommendations for MRCs to improve data sharing and integration of microbial material and associated data.
This document is intended to facilitate procedures such as…
Small craft — Hull construction and scantlings — Part 7: Determination of loads for multihulls and o...
This document defines the dimensions, local design pressures and global loads acting on multihull craft with a hull length (LH) or load line length of up to 24 m (see Note). It considers all parts of the craft that are assumed watertight or weathertight when assessing stability, freeboard and buoyancy in accordance with ISO 12217 (all parts). Scantlings corresponding to the local design pressures…
Petit navires — Construction de la coque et échantillonnage — Partie 10: Charges dans le gréement et...
Le présent document spécifie des méthodes pour la détermination:
— des charges de conception et des contraintes de conception dans les éléments du gréement; et
— des charges et des échantillonnages des points d'attache du gréement et du pied de mât/épontille;
sur les voiliers monocoques et multicoques.
Il donne également, dans des Annexes, des «pratiques établies» pour l…