Ingénierie des systèmes — Gestion du cycle de vie — Partie 4: Ingénierie des systèmes
Porté:
This part of This Standard
- specifies the Technical Management processes from ISO/IEC/IEEE 15288 that are required to be
implemented for planning a systems engineering project,
- gives guidelines for applying the required processes,
- specifies a required information item, a plan for the technical management and execution of the project
that is to be produced through the implementation of the Project Planning process,
- gives guidelines for the format and content of the required information item, and
- provides normative definition of the content of the information item that results from the application of
these processes to that end. In this part of ISO/IEC/IEEE 24748 that plan for technical project
management is termed the Systems Engineering Management Plan (SEMP).
Raison d’être du projet
Note : L’information ci-dessus a été recueillie et est diffusée par le Conseil canadien des normes (CCN) pour les besoins de son système de notification centralisé et transparent pour l’élaboration de nouvelles normes. Le système permet aux organismes d’élaboration de normes (OEN) accrédités par le CCN et aux membres du public d’être informés des nouveaux travaux d’élaboration de normes au Canada. Il donne aussi aux OEN accrédités la possibilité de repérer et de résoudre les cas de doubles emplois éventuels dans les normes et les travaux de normalisation.
Les OEN sont eux-mêmes responsables du contenu et de l’exactitude de l’information présentée ici. Cette information n’existe que dans la langue dans laquelle elle a été fournie au CCN.