Processus de gestion de la sécurité
Porté:
This standard will not include the incorporation of CSChE PSM Guide or the CSChE Process Safety Management Standard Audit Protocol into the NSC, either in the body of the standard or as an appendix. They will continue as the intellectual property of the CSChE, and may be updated as necessary to reflect the CSA PSM Standard.
The new PSM NSC will be developed with input from the CSChE and subject matter experts. A Technical Committee (TC) will be assembled, applying a balanced matrix (e.g., government, academia, etc) approach, to review and revise the draft seed document. The subject matter experts will participate on the TC to gain agreement of the content of the draft standard
Note : L’information ci-dessus a été recueillie et est diffusée par le Conseil canadien des normes (CCN) pour les besoins de son système de notification centralisé et transparent pour l’élaboration de nouvelles normes. Le système permet aux organismes d’élaboration de normes (OEN) accrédités par le CCN et aux membres du public d’être informés des nouveaux travaux d’élaboration de normes au Canada. Il donne aussi aux OEN accrédités la possibilité de repérer et de résoudre les cas de doubles emplois éventuels dans les normes et les travaux de normalisation.
Les OEN sont eux-mêmes responsables du contenu et de l’exactitude de l’information présentée ici. Cette information n’existe que dans la langue dans laquelle elle a été fournie au CCN.