1. Scope
1.1
This Standard specifies requirements for the safe siting, design, construction,
commissioning, operation, and decommissioning of facilities and associated
equipment for the dry storage of irradiated fuel.
1.2
The requirements in this Standard apply to the site, fuel-handling facility,
dry storage container, storage area, and support service structures, where
applicable…
Water quality — Sampling — Part 3: Guidance on the preservation and handling of samples
Gives general guidelines on the precautions to be taken to preserve and transport water samples (filling the container, use of appropriate containers, preparation of containers, cooling or freezing of the samples, filtration or centrifuging of samples, techniques generally suitable for the preservation of samples). These guidelines are particularly appropriate when a sample (spot or composite…
Safety of household and similar electrical appliances - Part 2: Particular requirements for wet and ...
1 Scope
This clause of Part 1 is applicable except as follows:
1.1 Replacement:
This standard applies to electrical motor-operated vacuum cleaners with a power input up to 10 kW and includes appliances and stationary equipment specifically
designed for wet suction, dry suction, or wet and dry suction for industrial and commercial use with or without attachments, for example for suction…
Soil quality — Sampling — Part 6: Guidance on the collection, handling and storage of soil for the a...
Describes the procedure to be observed: selection of sampling locations, description of field site, sampling conditions, sampling methods, sample marking, transportation conditions, soil processing, storage conditions, storage period, pre-incubation, test report.
Code for Digester Gas and Landfill Gas Installations
1.1.1 This Code applies to the installation of systems for the production,
handling, storage, and utilization of digester gas in newly-constructed
wastewater treatment plants, as well as additions to, and the upgrading of,
existing systems.
1.1.2 This Code applies to the installation of systems for the production,
handling, and utilization of landfill gas in newly-constructed landfill gas…
Spray-Application of Rigid Polyurethane Cellular Plastic Thermal
Insulation for Building Constructi...
1.1 This standard provides procedures to installers of spray-applied rigid
polyurethane cellular plastic thermal insulation in building construction. The
insulation is intended to be sprayed only into open cavities or onto surfaces
at the construction site. After the insulation application, the cavities or
surfaces can be enclosed.
1.2 The procedures include selection of chemical…
Graphical symbols for use on equipment. Index, survey and compilation of the single sheets
Establishes uniform graphical symbols, their graphic form, meaning and application. These graphical symbols are placed on equipment or parts of equipment of any kind in order to instruct the persons handling the equipment as to its use and operation; they are also placed on sites and ways where people may assemble, or move, giving them instructions, such as prohibitions, warnings, rules or limits…
Soil quality — Sampling of soil invertebrates — Part 1: Hand-sorting and extraction of earthworms
This document specifies a method for sampling and handling earthworms from field soils as a prerequisite for using these animals as bioindicators (e.g. to assess the quality of a soil as a habitat for organisms).
This document applies to all terrestrial biotopes in which earthworms occur. The sampling design of field studies in general is given in ISO 18400‑101 and guidance on the determination…